Automatic Computerized Double Hydraulic Guillotine (SQZ-155CTN KD)
Zhejiang Shenda Printing Machinery Co., Ltd.- Classification:Single-blade Cutter
- Driven Type:Hydraulic
- Type:Industrial Cutter
- Blade Material:HSS
- Computerized:Computerized
- Hydraulic:Double Hydraulic
Base Info
- Model NO.:SQZ-155CTN KD
- Screen:10.4 Inch Touch Screen
- Servo Motor:Yaskawa
- Transport Package:Wooden Case
- Specification:CE, ISO9001
- Trademark:shenda
- Origin:Ruian, Zhejiang, China
- HS Code:84411000
- Production Capacity:10sets,Month
Description
(Without auxiliary panel )
THE SYSTEM OF COMPUTER:
1. The displaying panel use 10.4 inch, you can adjust the color by yourself.
2. They have the high quality colors(25600), their storage can reach 170 groups,every group have 250 cut, Its storage time can reach 300,000 hours.
3. The multi-language operating interface, such as Chinese, English, Spanish...
4. It has luminous shortcut key so as to ensure the high stability.
THE APPARATUS CONTROLLED SYSTEM:
1. Adopts Switzerland ABB, German MULLER, Japan OMRON.
2. Servo motor is from Japan YASKAWA .
3. Air pump is from TAIWAN HOUBANG.
THE PAPER PUSHER CONTROLLED SYSTEM:
1. Roller ball lead screw: ABBA
2. Double rail guide way: ABBA
THE HYDRAULIC SYSTEM:
1.Adjustable-pressure double-hydraulic system(paper pressing and cutting both by hydraumatic)
2.combined valve from German, ISO approved hydraulic units.
3. Gear pump from ITALY.
THE SAFETY PROTECTED SYSTEM:
1. Extensible and precise infrared protective device from Shanghai Zhonghu photocell Control which reaches CE standard.
2. Blade-Replacement Device with safety and convenience.
3. Air cushion and chromeplating platform of photoelectricity protective device.
4. Underlay cutter frame.
5. The closed paper pusher frame.
6. Machine lock,safety bolting,the safety button and light grid.
7.The driving cutting part uses worm.
THE ACCESSORY WITH MACHINE:
1. Tool box: 1 set
2. Manual book
3. Operational CD
4. Guarantee sheet(details in contract)
OTHER EXPLAINTION:
1. The guarantee year is one year expect some consumptive parts, the machine should use correctly.
2. If the buyer need the supplier go for debug or maintain the machine, the buyer should pay the cost of tickets, room and board, traffic.
3. THE DELIVERY TIME: About 30 to 40 days after receipt of the deposit.(If we have no in stock)
4. In every order, the buyer should tell the supplier the voltage and the documents( clear custom )so as to avoid mistake.
6.The buyer should have the equipment to suspend and discharge for the machine.