Hydraulic Paper Cutting Machine (SQZ--67CTN KS)
Zhejiang Shenda Printing Machinery Co., Ltd.- Classification:Single-blade Cutter
- Driven Type:Hydraulic
- Type:Industrial Cutter
- Blade Material:Stainless Steel
- Computerized:Computerized
- Double Hydraulic:Double Lead Screw
Base Info
- Model NO.:SQZ-67CTN KS
- Transport Package:Wooden Case
- Specification:CE, ISO9001
- Trademark:SHENDA
- Origin:Ruian, Wenzhou, Zhejiang, China
- HS Code:84411000
- Production Capacity:25sets,Month
Description
THE SYSTEM OF COMPUTER:
1. The displaying panel use 7 inch, you can adjust the color by yourself.
2. They have the high quality colors(25600), their storage can reach 170 groups, every group have 250 cut, Its storage time can reach 300,000 hours.
3. The multi-language operating interface, such as Chinese,English,Spanish...
4. It has luminous shortcut key so as to ensure the high stability.
THE APPARATUS CONTROLLED SYSTEM:
1. Adopts Switzerland ABB, German MULLER.
2. Servo motor is from Japan YASKAWA .
THE PAPER PUSHER CONTROLLED SYSTEM:
1. General lead screw: ABBA Roller ball lead screw: ABBA (can be selected)
2. Double rail guide way: ABBA (the only one in china)
THE HYDRAULIC SYSTEM:
1.Adjustable-pressure double-hydraulic system(paper pressing and cutting both by hydraumatic),
2.combined valve from German, ISO approved hydraulic units.
THE SAFETY PROTECTED SYSTEM:
1. Extensible and precise infrared protective device from Shanghai Zhonghu photocell Control which reaches CE standard.
2. Blade-Replacement Device with safety and convenience.
3. Air cushion and chromeplating platform of photoelectricity protective device.
4. Machine lock, safety bolting, the safety button and light grid.
OTHER EXPLAINTION:
1. The guarantee year is one year expect some consumptive parts, the machine should use correctly.
2. If the buyer need the supplier go for debug or maintain the machine, the buyer should pay the cost of tickets, room and board, traffic.
3. THE DELIVERY TIME: About 30 to 40 days after receipt of the deposit.(If we have no in stock)
4. In every order, the buyer should tell the supplier the voltage and the documents( clear custom )so as to avoid mistake.
6.The buyer should have the equipment to suspend and discharge for the machine.