Post-Press Equipment

Industrial Drying Tunnel Equipment

Shenzhen Tamprinter Printing Machinery Co., Ltd.
  • Tunnel Width(mm):650
  • Transport Package:Plywood,Case
  • Specification:580kg
  • Trademark:tamprinter
  • Origin:China

Base Info

  • Model NO.:TM-IR4m-jet
  • HS Code:8525801190
  • Production Capacity:50sets,Month

Description

Model Parameter

TM-IR4m-jet

Tunnel Width(mm)

650

Power(P/V/Hz)

3/380/50

Heat pipe(KW)

3pcs*6kwX 2Group=36

VDF power(W)

1.5KW*2PCS

Total power(KW)

40

Tunnel Dimension(L*W*H)

4050*1010*1680

Electric box (L*W*H)mm

600*600*960

Weight(kg)

580

Note:All specification, dimension and design will not change if there is not any notice.

 

 

        Installation

 

3.1       Transit safety item

1.  During transiting (moving or loading and unloading vehicles), machine should be moved by fork-lift and kept the balance. Carry it by carriage or container.

2.  Use the enough load capability fork-lift to transit machine.

  1. Environment

    Environment

    temperature

    -10ºC~45ºC(no ice cover)

    Environment

    humidity

    Bellow 90%RH(no dew)

    Save temperature

    -20ºC~+65ºC

    Environment

    In room

    (No causticity,flammable gas,paint dust)

    Altitude height

    Below 1000m

     

    3.4  Installation method/figure

     When installing the machine, there must be more than 1.5 m distance between the wall and machine. 3m spaces also have to be left for equipment operation.

    Industrial Drying Tunnel Equipment
     

    3.5  Installation and level adjustment

    Install this machine in the solid state reinforced concrete, and excess space can be used to place the work piece .When machine installed in the correct place, you can adjust machine longitudinal and transverse level by the adjusting screw at four corners.

    Industrial Drying Tunnel Equipment
     

    3.6   Power source requirement

    If the power source' voltage is not enough, it will affect the motor's output and the controller's function.

    It is very important to use the correct voltage to connect the machine and the power source. And only use the independent power source.

     

    3.7   Exterior power source connection

    Before connect the power source wire, you must make sure whether the machine voltage is the same as factory' power source voltage.

    Connect the wire to L1, L2, L3 ,N,PE.

    After connected the wire, make sure it is connected on the right Joints (figure)

    Machine must be correct grounding so as to prevent from electric shock. Machine should be operated by the qualified electrician.

     

    3.8   Power source inspection

       

     

    Power Switch                                      power source switch

     

    1.After connect the power source,it is very necessary to check whether the wire are  connect to the joints correct.

    2. Rotate main switch on electric controller.

    3. open the electrical control box, try to change three phase L1L2L3 sequence, Check whether the electrical source' three phase wires are connected correct. Phase sequence indicator  LED Light Up is OK

     If not, exchange any two wires connection of three phase line L1, L2, L3.

    4.  Above operation should be operated by the qualified electrician.

     

    4.      Operation

    4.1Operation position (figure)

    4.2   Operation panel instruction

     

     

     

    4.3  Emergency stop

     

    During the machine running, if there are any abnormal function occurred; press this button to stop all movement. When resume of this button, first switches all vdf at the min position.

     

    4.4  Operational procedures

    Figure  1                          

                   

    1,Before the first start-up, machinery should be checked whether grounding, then user should pay attention to check whether the grounding line remains firmly grounded everyday.

    2,Before start-up , the protective covers and protective doors should be closed, or

    choose to use tape to seal the leaky mouth AIR pipe to avoiding workshop temprature raise.

    3,First turn power switch to the right (Figure 1), the main power lines in electronic

    control box are connected, and fan starts to work..

    4,Periodically check the electrical wiring for circuit phenomenon.10,Adjust the belt tension on both sides to prevent the belt running to the false way.

    5,Having good hygiene, to prevent dust.

    6,If there is an imminently hazardous situation, immediately turn off the main power switch, to avoid further accidents.

    Industrial Drying Tunnel Equipment
    Industrial Drying Tunnel Equipment
    Industrial Drying Tunnel Equipment