Post-Press Equipment

Automatic High Speed Oval Cover Forming/Making Machine Coffee Cup Ice Cream Lid Making Machine with CE Standard

YUANGANG INTERNATIONAL TRADE(SHANGHAI) CO., LTD.
  • After-sales Service:1 Year
  • Warranty:1 Year
  • Species:Paper Lid Making Machine
  • Placing Form of Template:Horizontal
  • Computerized:Computerized
  • Automatic Grade:Automatic

Base Info

  • Model NO.:ZGJ-70T
  • Application:Paper Packaging Materials
  • Power Source:380V 3pH 50Hz
  • Max Speed:45PCS,Min
  • Lid Height:14-20mm
  • Raw Material:PE Coated Paper
  • Paper Weight:280-450GSM
  • Power:10kw
  • Machine Weight:3500kgs
  • Packing Size:2350*1700*1850mm
  • Transport Package:Fob
  • Specification:2350*1700*1850(mm)
  • Trademark:MICWELL
  • Origin:China
  • HS Code:8441309000

Description

Overview Product Description

 


Detailed Photos

 




After Sales Service

 

1. About payment
 
After signing the contract, 30% of the total payment will be paid in advance, and the factory will accept the payment and pay the full amount of the machine for delivery.

2. About delivery time

About 90 working days after receiving the deposit (non-standard machine), the factory will re-decide whether to change the delivery date when the order is confirmed. The standard machine is generally within 60 working days after receiving the deposit.

3. Order tracking
 
After the customer places an order, our company will send professional personnel to track the order and regularly report the production progress to the customer. Customers can check the order status on the official website (delivery query).

4. Product testing

During the production process, our company will adopt strict inspection process to ensure product quality. Through internal inspection, we ensure that the components produced by our company meet the technical requirements; through external inspection, we ensure that the components produced by our company are not subject to quality problems; and then pass the whole machine inspection to ensure that the mechanical equipment meets the technical production requirements .

5. Product packaging

 
Before the product is shipped, it will be packed in a strict vacuum plus bottom tray (wooden tray or steel tray)

6. Product Transportation
 
Products are generally shipped from Ningbo Port, China to the destination port by sea.

after sales question
_____

01. Shelf life/warranty period of the product
 
The product warranty period is generally one year, and our company provides lifetime maintenance services. If the machine has quality problems, our company will help the customer to solve it through the following ways: a. Send spare parts to the customer. b. Remotely assist customers in maintenance. c. Notify our agent company to send personnel to the customer's factory for maintenance. d. Our company directly dispatches relevant personnel to the customer's factory for maintenance.
02. About transportation damage
 
In the process of product transportation, if product damage occurs, it is determined that our product packaging and reinforcement work is not in place, and our company will bear the corresponding losses.
03. About machine maintenance
 
We will contact customers on a regular basis on how to maintain and maintain the machine. For domestic customers, we will have a master to provide on-site service.
04. Problems during use
 
If there is any problem in the process of using the product, the customer can directly call or send an email to our after-sales department (24-hour hotline). The personnel of our department will respond immediately and make a decision on the response measures within 24 hours.